GPR Utility Survey for the Hajj 1448H Quick-Win Projects in Makkah
Project Overview
ASAS Lab carries out ground-penetrating radar (GPR) surveys to locate buried services and utilities for the project to design and build quick-win projects serving Hajj 1448H in Makkah. The owner is the National Water Company, the main contractor is Bright Company Ltd, the supervisor is Beit Al-Khebra Engineering Consultants, and the project duration is 6 months.
Scope of Work
Ground-penetrating radar (GPR) surveys to locate buried services and utilities before excavation, at multiple sites in Makkah for the Hajj 1448H quick-win projects.
Project parties
Owner: National Water Company (NWC). Main contractor: Bright Company Ltd. Supervisor: Beit Al-Khebra Engineering Consultants. Location: Makkah. Project duration: 6 months. ASAS Lab's role: ground-penetrating radar surveys to locate buried services and utilities.
Route surveys before excavation
The ASAS Lab team scans each work route with ground-penetrating radar before excavation starts, to map buried service routes and avoid clashing with them during construction. The survey is non-destructive, so no digging is needed for the survey itself, and it helps the contractor and supervisor plan excavation safely on busy streets near Makkah's central area.
Field coverage across multiple sites
The lab's teams work in coordination with the contractor and supervisor at multiple sites in Makkah, including roads near Masar, the Clock Tower and a road tunnel, marking survey locations on site and documenting the results for each one.